检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]内蒙古交通设计研究院有限责任公司,呼和浩特010010 [2]武汉理工大学交通学院,武汉430063
出 处:《交通科技》2014年第2期25-27,共3页Transportation Science & Technology
基 金:内蒙古自治区交通科技项目(NJ-2012-18)资助
摘 要:大吨位T形刚构转体桥施工作业技术难度大,不确定因素多,对其施工过程展开风险评估研究非常必要。根据风险评估与管理理论,利用综合识别法识别出转体过程中的施工风险因素,并对转体过程的主要风险源进行风险评估,提出相应施工风险控制对策,为今后类似桥梁施工管理及风险评估提供借鉴。Due to the technical difficulty and uncertainty of rotation construction of large tonnage T-shaped rigid frame bridge,it is necessary to perform construction risk assessment.Based on the risk assessment and management theory,the risk factors in the construction process are identified accord-ing to the comprehensive identification method.The main risk source of the construction process is as-sessed and the corresponding risk control measures are proposed.It is a good reference for the con-struction management and risk assessment of similar bridges.
关 键 词:大吨位 T形刚构桥 施工风险 风险评估 控制对策
分 类 号:U448.22[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28