大吨位T形刚构桥转体施工风险评估与对策研究  被引量:4

Construction Risk Assessment and Counter Measures of Rotation Construction of LargeTonnage T-shaped Rigid Frame Bridge

在线阅读下载全文

作  者:郭子仪 车晓军[2] 范振华 周庆华[2] 

机构地区:[1]内蒙古交通设计研究院有限责任公司,呼和浩特010010 [2]武汉理工大学交通学院,武汉430063

出  处:《交通科技》2014年第2期25-27,共3页Transportation Science & Technology

基  金:内蒙古自治区交通科技项目(NJ-2012-18)资助

摘  要:大吨位T形刚构转体桥施工作业技术难度大,不确定因素多,对其施工过程展开风险评估研究非常必要。根据风险评估与管理理论,利用综合识别法识别出转体过程中的施工风险因素,并对转体过程的主要风险源进行风险评估,提出相应施工风险控制对策,为今后类似桥梁施工管理及风险评估提供借鉴。Due to the technical difficulty and uncertainty of rotation construction of large tonnage T-shaped rigid frame bridge,it is necessary to perform construction risk assessment.Based on the risk assessment and management theory,the risk factors in the construction process are identified accord-ing to the comprehensive identification method.The main risk source of the construction process is as-sessed and the corresponding risk control measures are proposed.It is a good reference for the con-struction management and risk assessment of similar bridges.

关 键 词:大吨位 T形刚构桥 施工风险 风险评估 控制对策 

分 类 号:U448.22[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象