检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]昆明理工大学冶金与能源工程学院,云南昆明650093
出 处:《能源研究与信息》2014年第1期35-38,共4页Energy Research and Information
摘 要:针对云南某水电站,在优化导叶关闭规律的基础上,对两台水轮发电机组在额定水头、额定出力、全部甩负荷运行时的大波动过渡过程进行了计算.通过建立数学模型,采用特征线法,运用Matlab/Simulink软件对机组大波动过渡过程进行了模拟仿真,计算结果基本是可行的.研究为该水电站安全稳定运行提供了参考,同时为同类型电站在设计施工时计算大波动过渡过程提供了依据.For a hydropower station in Yunnan, the load rejection process of two hydroelectric generating sets from rated head and output was calculated on the basis of guide vane closure rule optimization. The mathematical model of this large oscillation transient process was built and solved with Matlab/Simulink and characteristic line method,and reasonable results were obtained. The results provide a reference for steady operation of this power station and a basis for large oscillation transient process calculation in the design and construction of similar power stations.
分 类 号:TV734.21[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26