高砂水电站大坝8号坝段稳定复核研究  

Rechecking Research on the Stability of No. 8 Dam Monolith of Gaosha Hydropower Station

在线阅读下载全文

作  者:林金洪 高雅芳[2] 

机构地区:[1]福建华东岩土工程有限公司,福建福州350003 [2]中国水电顾问集团华东勘测设计研究院有限公司,浙江杭州310014

出  处:《水力发电》2014年第5期37-39,共3页Water Power

摘  要:高砂水电站8号坝段建基面以下泥化夹层施工时未全部清除,经过16年的运行,该坝段坝基下不连续的全一强风化夹层的摩擦系数在泡水状态下有所降低。通过分析大量基础地质资料,对沿建基面及沿软弱夹层的抗滑稳定进行了复核计算及敏感性分析,综合监测成果进行安全评价后认为,大坝整体上是安全的。The interlayer argillization in the foundation of No. 8 dam monolith in Gaosha Hydropower Station is not fully cleared out during construction. After the continuous operation of 16 years, the inconsecutive full-intense weathering intedayer's friction coefficient of this monolith reduces as soaking in water. Through the analyses of geological data, the recalculation and sensitivity analyses of anti-slip stabilities along foundation surface and interlayer, and the analyses of monitoring data, the dam is evaluated as safe one.

关 键 词:坝基稳定 复核 泥化夹层 地质参数 高砂水电站 

分 类 号:TV698.23[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象