作 者:郑琳[1]
机构地区:[1]中国水电工程顾问集团有限公司,北京100120
出 处:《水力发电》2014年第5期73-76,87,共5页Water Power
摘 要:目前,部分水电站编写的地震应急预案针对性和可操作性不强,特别是高坝大库水电站具有特殊风险,在地震应急预案中没有对此特殊风险进行针对性的辨识评价,更没有提出有效的对策措施和处置方案,遇到强震时有可能造成比常规水电站更大的灾难。结合西部地区高坝大库的特点及现状,提出高坝大库水电站地震应急预案,并对亟待解决的问题进行分析。Currently, the earthquake contingency plan of some hydropower stations is poor in relevance and operation, especially for the special risks of high dam and large reservoir, in which, the special risks are not specially identified and evaluated in earthquake contingency plan, and no effective countermeasures are proposed. These hydropower stations with high dam and large reservoir may cause a greater disaster than other hydropower stations in earthquake. Combining with the characteristics and status of high dam and large reservoir in western region, the main contents of earthquake contingency plan are proposed and some problems are analyzed.
分 类 号:X9-64[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249