检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:付传雄[1,2] 张伟[3] 刘文静[4] 廖文来[1,2]
机构地区:[1]广东省水利水电科学研究院,广州广东510635 [2]广东省岩土工程技术研究中心,广州广东510635 [3]广西大学防灾与结构安全教育部重点实验室,广西南宁530004 [4]华南理工大学广州学院电气工程学院,广州广东510800
出 处:《水力发电》2014年第5期88-90,共3页Water Power
摘 要:采用三维有限元法模拟闸墩的主要工况和蓄水过程,研究在各种可能工况下闸墩顶部竖向与水平位移的变化规律,获得坝顶竖向与水平位移变化范围;结合枢纽本身特性、库区温度条件和现有观测资料,获得温变及时变产生的位移变化范围,进而给出闸墩位移的监控指标限值,为大坝监测提供定量依据。The changes of vertical and horizontal displacements on the top of pier in a large navigation-hydro complex under different operation conditions and water-storage process are studied by using three dimensional finite element method, and then the vertical and horizontal displacement ranges of crest are obtained. At the same time, the displacement component changes caused by temperature change and time varying are also gained according to structure characteristics, reservoir area temperature and existing monitoring data. The limits of pier displacement monitoring components are finally proposed to provide a quantitative basis for the monitoring of dam.
分 类 号:TV698.11[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42