The feasibility experimental study of pumping and shunting pump under pressure in water injection station  

The feasibility experimental study of pumping and shunting pump under pressure in water injection station

在线阅读下载全文

作  者:Dongbo SHAO Yong WANG Suiwang ZHANG 

机构地区:[1]Research Center for Ultra-Low Permeability Reservoirs of PetroChina Changqing Oilfield Compangy, xi'an ,shaanxi 710018 China

出  处:《International Journal of Technology Management》2013年第3期34-37,共4页国际技术管理

摘  要:At present in the process of water injection station operation, starting and stopping the pump caused system pressure fluctuations, and the fluctuations caused many problems about downstream injection wells. In order to eliminate the fluctuations and reduce problems, taking start pump, connect pump test under pressure in the water injection station installed the rotor frequency control system Changqing oil field developed. During the experiment, by progressively increasing the pressure pump to verify start pump with pressure feasibility test, the result shows when the pressure in the 0-25MPa pressure start and connect pump can be realized, and forecast the maximum pressure of the current start of the station with pressure pump. Start pump with pressure achieve the elimination of pressure fluctuations, provide the prerequisites about realizeing stable water injection pressure, and ultimately realize oil field water injection station to be automatic water injection laid a foundation.

关 键 词:water injection station wire-wound motor pumping pump under pressure feasibility experiment 

分 类 号:TQ051.13[化学工程] TM93[电气工程—电力电子与电力传动]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象