检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《建材世界》2014年第2期130-133,156,共5页The World of Building Materials
基 金:南水北调中线一期工程总干渠沙河北~黄河河南南段郑州1段2标段渠道开挖范围内基岩强度与施工开挖方法研究(H2013tj65)项目资助
摘 要:在南水北调一期工程中,郑州1段第二标段地质条件复杂,岩石的强度、埋深不一,需要对不同强度岩石的开挖方量进行计算,对应采取不同的开挖方案。分别采用断面计算法、不规则三角网法、方格网计算法等方法对基岩的空间分布、开挖方量计算进行了详细的研究,为渠道开挖施工提供必要的科学参数,为科学信息化施工组织提供技术支撑。In the first stage of the South-to-north Water Transfer Proj ect,the geological conditions of the second section of the one section of Zhengzhou and the types of foundation soil of the canal are complex.There are a series of problems during the excavation process,such as the different strength of the same rock,especially the undulating boundary of the rocks and the different buried depth.In order to calculate the excavation volume of the rocks with dif-ferent strength,we should take the corresponding approaches to the problems.This article made a detail research on the spatial distribution of the basic rocks and the calculation for the volume of the excavation and used the cross,verti-cal method to provide the necessary technology data in this proj ect and provided a technology support for planning and programming of proj ect construction.
分 类 号:TV68[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229