作 者:李健 张植华 林毓 崔文婷[2] 刘洪[2] 周金程[2]
机构地区:[1]深圳供电局有限公司,深圳518033 [2]天津天大求实电力新技术股份有限公司,天津300384
出 处:《电力系统及其自动化学报》2014年第4期67-70,共4页Proceedings of the CSU-EPSA
摘 要:针对传统中压配电系统网架结构研究中未将变电站与线路接线模式综合统一考虑的现象,该文重点结合三供一备接线模式,构建了基于三供一备接线模式的中压配电系统供电模型。在此基础上,对各种供电模型的主变供电能力指标和网络供电能力指标进行定量分析,得到各种供电模型的主变理论最大负载率以及主变实际负载率、主变实际出线条数、线路实际负载率等关键指标,从而有效指导配电网网架建设。Traditional research of medium voltage distribution network structure just focuses on the connection mode,which fails to consider the substations and connection mode.Based on three-supply-one-backup (TSOB) connection mode,power supply models of medium voltage distribution system were constructed.For each power supply model,the power supply capability of substation and network were analyzed.Some key factors of each power supply model were obtained,such as the maximum theoretical load rate of transformers,the actual load rate of transformers,the actual number of output feeder lines of transformers and the actual load rate of lines,which are able to serve as a guideline for distribution network structure construction.
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.233