检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《港工技术》2014年第1期52-56,共5页Port Engineering Technology
摘 要:在利用灰色GM(1,l)和Verhulst模型预测真空预压加固吹填土地基的最终沉降量时,建模序列直接影响预测结果的精度。结合某吹填土地基加固工程的沉降监测数据,探讨监测序列长度、建模序列长度对上述2种模型最终沉降量预测值及预测精度的影响,总结出不同模型预测地基最终沉降量时建模序列的选取规律。研究结果表明,上述2种模型预测地基最终沉降量的误差均小于1.0%,灰色GM(1,l)模型的适应性更好。When grey GM(1,1) and Verhulst models are used to predict final settlement of dredger fill foundation reinforced by vacuum preloading method,the adopted modeling sequence affects directly the accuracy of prediction results. The settlement monitoring data on dredger fill foundation reinforcement are adopted to discuss the impact of the monitoring sequence length and the modeling sequence length on the accuracies of final settlement prediction values by applying the above two models. It is summarized the selection rule of modeling sequence for predicting final settlement with different models. The research results show that the above two models are able to predict final foundation settlement with the error less than 1.0%. In addition,grey GM(1,1)model is of better adaptability.
关 键 词:灰色GM(1 l)模型 VERHULST模型 吹填土地基 最终沉降量 预测 GREY GM model(1 1)
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.99.196