检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国葛洲坝集团股份有限公司勘测设计院,武汉430223 [2]中铁十二局集团第二工程有限公司,太原030032
出 处:《水利科技与经济》2014年第3期133-136,共4页Water Conservancy Science and Technology and Economy
摘 要:为确保大瑶山隧道近接水库段洞内施工安全,防止发生突水危险,采用分段渐进帷幕注浆技术对该地段进行地表加固并形成防渗帷幕。由于浆液对岩体裂隙起到了很好的封堵作用,隧道内仅出现局部渗水情况。实践证明,该方法改善了地表土层的性质,有效地隔断了地下水的渗流路径,提高了隧道通过该地段的安全性。To maintain Dayaoshan tunnel construction safety and prevent the water- inrush, subsec- tion progressive curtain grouting technology is used to surface strengthening and form anti - seepage curtain of the reservoir section. Tunnel leakage appears in few regions due to grout has blocked the rock fracture. The practice proved that this technology can improve the characteristics of surface soil layer, and effective separate the seepage path of groundwater, moreover advance the security of con- struction in tunnel near by reservoir section.
关 键 词:地表加固 分段渐进帷幕注浆 注浆效果 水库 大瑶山隧道
分 类 号:TV52[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.108.227