浅析平顶山矿区主要生态环境问题及生态重建  被引量:2

Analysis on the main ecological and environmental problems and ecological reconstruction in Pingdingshan mining area

在线阅读下载全文

作  者:王力 王建伟 

机构地区:[1]神木县隆德矿业有限责任公司,陕西榆林719302

出  处:《陕西煤炭》2014年第2期54-56,共3页Shaanxi Coal

摘  要:介绍了平顶山市矿区生态主要问题,并对平煤股份二矿矸石山和七矿塌陷地生态重建实践的实例进行了分析,表明通过工程措施、生物措施、化学措施等途径有效地改善了矿区生态环境,而且还探索出资源、环境与经济可持续发展的新路。同时,在生态重建过程中还注重景观建设,对平顶山市经济转型、社会形象的改善有一定的促进作用。The paper introduced the main ecological problems in pindingshan mining area and analyzed the ecological reconstruction practice in No2 coal mine' s gangue hill and No7 coal mine' s subsidence area. The example analysis showed that the ecological envi- ronment in Pingdingshan mining area was improved effectively by engineering measures, biological measures and chemical measures, and the new way of resource, environment and economic sustainable development for the gangue resource utilization was summarized. At the same time, the landscape construction was emphasized in the ecological reconstruction process and it played a positive role to e- conomic transformation and the improvement of social image for Pingdingshan city.

关 键 词:平顶山矿区 矸石山 塌陷地 生态重建 

分 类 号:X752[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象