检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]三峡电力职业学院,湖北宜昌443000 [2]武警水电部队,湖北武汉430000
出 处:《水电与新能源》2014年第4期18-20,共3页Hydropower and New Energy
摘 要:为实现皂市水电站碾压混凝土工程质量控制目标,施工时对运输、卸料、摊铺、平仓、碾压各工序实施严格质量管理,重点控制层间接合及异种混凝土结合部施工质量,釆用先进、经济、高效的斜层平推铺筑法替代传统的通仓薄层连续浇筑法,并加强高温季节施工过程管理。大坝混凝土取样检测各项指标合格,达到优良等级。To fulfill the requirement of quality control on roller compacted concrete construction in Zaoshi hydropower station, strict quality management is implemented in the construction process of transportation , unloading, paving, spreading and rolling compaction of concrete .Emphases are given to the construction quality of layer joints and the inte-gration of heterogeneous concrete .The traditional full-length thin-layer continuous pouring method is replaced by an ad-vanced , more economic and efficient inclined-layer placing method , and more attention is paid to the management of construction process in high temperature seasons .With these measures , the concrete construction in Zaoshi hydropower station shows a good quality as all indication data of the concrete samples tested are qualified .
分 类 号:TV544.921[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49