检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:魏香满
机构地区:[1]福建省宁德市水利电力工程局,福建宁德352100
出 处:《水利建设与管理》2014年第4期9-12,共4页Water Conservancy Construction and Management
摘 要:木兰溪下游防洪一期河道工程是南方滨海地段重要的工程之一,工程现场地貌复杂,施工技术难度较大。在下游防洪一期河道工程的治理过程中,基础工程、河道阻滑工程及河道防冲工程成为较关键的内容。本文就木兰溪下游防洪一期河道工程软体排防护技术应用进行探讨和分析,以供沿海地区其他类似工程借鉴。Mulanxi downstream flood control stage I river project is one of the important projects in southern coastal area . The project site is characterized by complicated topography and large construction technical difficulty .Foundation work , river slip resistance work and river scour protection work become more critical contents in the governance process of downstream flood control stage I river project .Mulanxi downstream flood control stage I river project soft mattress protection technique is discussed and analyzed in the paper , thereby providing reference for other similar projects in coastal areas .
分 类 号:TV65[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90