检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电建四川电力设计咨询有限责任公司,四川成都610016 [2]四川省电力公司,四川成都610094
出 处:《中国电力》2014年第5期72-77,82,共7页Electric Power
摘 要:为解决川渝负荷中心电网本身动态无功支撑不足、提高电网稳定水平且满足未来四川更多富余电力东送问题,结合未来川渝交直流电网规划,从川渝交直流特高压电网相关站点加装静止无功补偿器(SVC)的具体条件和可行性等方面,研究川渝交直流特高压电网相关站点加装SVC对提高电网稳定水平和川电外送能力的积极作用。研究结果表明:2020年川渝电网相关特高压站点上加装一定容量SVC后,整个交流通道的送电能力可提高约3 700 MW。In order to resolve the problem of insufficient dynamic, reactive power support of the load center of Chengdu-Chongqing power grid and improve the grid dynamic stability and transfer spare hydropower from Sichuan to eastern China, the grid dynamic stability by installing SVCs in relative substations in Sichuan-Chongqing Grid of UHVAC/UHVDC was studied based on the planning of the AC-DC Sichuan-Chongqing power grid and the feasibility study of installing SVC at some relative nodes. The results show that the capacity of the AC passage can be increased by about 3 700 MW after installing SVCs with certain capacities on relative UHV notes in Chcngdu and Choogqing grids by 2020.
分 类 号:TM761.12[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145