检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京市建筑设计研究院有限公司
出 处:《暖通空调》2014年第5期2-9,共8页Heating Ventilating & Air Conditioning
摘 要:设备和管道系统的承压能力是影响空调水系统竖向分区的主要因素。通过对国内外30余项规范标准及10多个厂商产品参数的调研,分析了空调系统主要设备、管道及连接方式的承压能力;结合20个工程案例,对国内外在建和建成的典型超高层建筑空调水系统形式和竖向分区方法进行了归类总结;基于理论与工程案例分析,得出了超高层建筑空调水系统竖向分区原则和不同高度超高层建筑水系统竖向分区方案。The pressure bearing capacity of equipment and pipeline system is a main factor affecting vertical zoning of air conditioning water system. Based on the research of more than thirty standards at home and abroad, as well as parameters of various products from more than ten manufacturers, analyses the pressure bearing capacity of major equipments, pipes and connections of air conditioning systems. Combined with twenty projects, classifies and summarizes the forms of air conditioning water system and the methods of vertical zoning in typical super high-rise buildings in the construction and completion at home and abroad. According to analysis in theory and by project cases, obtains both the principles and the schemes of vertical zoning of air conditioning water system in super high-rise buildings with different heights.
关 键 词:超高层建筑 空调水系统 竖向分区 管道承压设备承压
分 类 号:TU831[建筑科学—供热、供燃气、通风及空调工程] TU976
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.55