检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张旻[1]
机构地区:[1]中国水电顾问集团成都勘测设计研究院,成都610072
出 处:《西北水电》2014年第2期103-106,共4页Northwest Hydropower
摘 要:在勘测设计过程中,设计院存在无资质、需协助、人力资源不足等原因,需要委托外部专业单位、院校对设计院无法单独完成的勘测设计工作予以承担。但是很多时候,设计委外只是解决了设计院在设计过程中的一时之需,通过设计委外提高设计院核心竞争力方面还做的不够。文章就设计院目前设计委外难以转化为企业核心竞争力的主要问题,对其产生的原因作深入分析,使设计委外成为提高设计院核心竞争力的方法之一。During investigation and design, some works have to be commissioned to special companies, colleges and universities because the design institute can not independently execute those assignments because of no qualification, assistance required and lack of human resource, etc.Mostly, this design commission only helps the institute temporarily but insufficiently improves the core competition of the design institute.Therefore, issues on this commission for the improvement of the core competition are deeply analyzed in term of causes so that the design commission could be the one of the means for the improvement of the core competition of the design institute.
分 类 号:TV213.9[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30