检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北医科大学第二医院肝胆外科,河北石家庄050000
出 处:《中国医药导报》2014年第13期122-124,129,共4页China Medical Herald
摘 要:目的探索品管圈质量改进方法在降低中心静脉导管非计划性拔管中的作用。方法成立品管圈,确立"降低中心静脉导管非计划性拔管率"为活动主题,进行现况调查、要因分析、拟定对策,运用PDCA循环的原则进行对策的实施和效果确认,标准化检讨与改进等。结果实施品管圈后,中心静脉导管的非计划性拔管率由活动前的23.08%降至活动后的7.41%,差异有统计学意义(P<0.05),这不但减轻了非计划性拔管给患者带来的痛苦,还达到了医护与患者双赢的目的。结论开展品管圈活动,不仅能降低中心静脉导管的非计划性拔管率,还能提高团队的整体素质。Objective To investigate the effect of improving quality control circle in reducing of the unplanned extuba- tion rate of central venous catheter. Methods The reducing of unplanned extubation rate of central venous catheter was as the theme, investigation, cause analyzing and making strategies were used in establishing quality control circle. The countermeasures were implementated and the effect was confirmed according to principles of PDCA circulation, im- proving and reviewing with standard were also implied. Results After the quality control circle, the unplanned extuba- tion rate of central venous catheter reduced from 23.08% before the activity to 7.41%, the difference was statistically significant (P 〈 0.05). The pain of the patients brought by unplanned extubation was relieved, and a win-win object for nurses and patients was obtained. Conclusion Promoting the activity of quality control circle can not only reduce the unplanned extubation rate of central venous catheter, but also improve the quality of the whole team.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15