机构地区:[1]扬州自来水有限责任公司,江苏扬州225009 [2]上海市基础工程集团有限公司,上海200432
出 处:《中国给水排水》2014年第10期100-102,共3页China Water & Wastewater
摘 要:扬州第一水厂新铺设一根DN2 000的浑水管线,在穿越京杭大运河时采用了顶管施工方式。该顶管工程量大,施工条件不佳,地层特殊,且周边环境复杂,通过采取合理、有效的施工措施,确保了施工顺利进行。详细介绍了中继间的设置、工具管出洞、钢管焊接、注浆减阻以及顶管入洞等方面采取的技术措施,以供参考。During the expansion of Yangzhou First Water Plant, pipe jacking technology had to be adopted for laying a new DN2 000 raw water pipeline when it traveled through the Grand Canal. Consid- ering the characteristics of the project, such as large work amount, poor construction condition, special stratum and complex surroundings, appropriate measures should be taken to ensure the smooth progress of the construction. The technical measures taken in setting of intermediate jacking station, tool tube out of hole, welding of steel pipes, grouting for reducing resistance and jacking pipe into hole were introduced for reference.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249