红毛洞电站水轮发电机组优选设计  

Turbine Optimum Design for Hongmaodong Hydropower Station

在线阅读下载全文

作  者:唐仕红 

机构地区:[1]贵州毕节市勘测设计研究院,贵州毕节551700

出  处:《黑龙江水利科技》2014年第2期39-41,共3页Heilongjiang Hydraulic Science and Technology

摘  要:红毛洞电站装机2×10MW工程指标相对并不优,因此设计时要尽量优化减少投资是非常必要的。为此,根据水轮机选择原则并结合目前水轮机的发展情况,对红毛洞电站进行优化选择设计。如通过机型选择比较,推荐HLA551C-LJ-172机型,根据水轮机计算的有关参数,选定2台10 MW悬式水轮发电机等。Hongmaodong hydropower station has installed plant 2 × 10MW,its engineering index relative are not excellent,therefore it is necessary to optimize the design so as to reduce the investment. Based on the principles for turbine selection and combined with turbine development situation,optimum design is conducted for Hongmaodong hydropower station. For example through type selection,HLA551C-LJ-172 models are recommended; according to the turbine parameters calculation,210 MW suspension hydraulic generator is selected etc.

关 键 词:水轮机 模型综合特性曲线 运转特性曲线 调保计算 优选设计 

分 类 号:TV734[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象