检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西南交通大学土木工程学院,四川成都610031
出 处:《重庆交通大学学报(自然科学版)》2014年第2期81-85,共5页Journal of Chongqing Jiaotong University(Natural Science)
基 金:国家"973"计划资助项目(2011CB409902);中国铁路总公司科技研究开发计划重点项目(2013G014-A)
摘 要:研究了汶川地震灾区泥石流损害线路工程的典型事件,归纳出泥石流对线路工程有4种危害模式:掩埋和淤积、冲刷、冲击、堵塞主河。基于泥石流堵塞主河对线路工程造成的危害最为严重的现象,提出了以"最大限度利用主河输移和容纳泥沙的能力"为指导的防灾对策;基于主河水位壅高值计算式和泥石流堵河异岸受灾判据,给出了主河最大容纳泥沙量的确定方法。The typical damage events of highways along rivers caused by debris flow in Wenchuan earthquake areas were studied. Four disaster models of highways along rivers caused by debris flow were concluded, deposit, erosion, impact and damming-river. According to the phenomenon that the most serious damage to highways along rivers was caused by demming- river by debris flow, the disaster prevention mode of making greatest use of the maximum capacity of carrying sediment of the main river was proposed. Based on the calculation equation of head-water level and criteria of disaster at the opposite river bank caused by debris flow river-blocked, the method of determining the maximum capacity of carrying sediment of main riv- er was then presented.
关 键 词:环境工程 泥石流 震后灾区 线路工程 危害模式 防灾模式
分 类 号:U416.1[交通运输工程—道路与铁道工程] P642.23[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.157