秦岭终南山隧道2#竖井机械化配套施工技术  被引量:1

Mechanized construction matching Technology of the second Shaft Qinling Mountains Zhongnan Mountain Tunnel

在线阅读下载全文

作  者:何东春 何敬晨 杨隆威 

机构地区:[1]黑龙江龙煤矿山建设有限公司,黑龙江鸡西158100

出  处:《山东煤炭科技》2014年第4期139-140,143,共3页Shandong Coal Science and Technology

摘  要:针对亚洲第一大直径Ф11.2m―秦岭终南山2#竖井通风口的工程地质特征和现场实际情况,设计先进合理的施工方案,选用与施工工艺相配套的机械化装备,科学管理,合理组织施工队伍,取得2#竖井月进尺连续5个月超过70m,最高月进尺80 m的好成绩,实现了安全、优质、快速、高效施工。According to the engineering geological characteristics and the actual situation at the scene of the second ventilation shaft of Qinling Mountains Zhongnan tunnel,which is the largest diameter 11. 2m in Asia's,designing the advanced and reasonable construction scheme, selecting the construction technology matching with mechanical equipment,scientific management,rational organization of construction team,made footage exceeding 70 m per month for 5 consecutive months during driving the second shaft,the highest monthly footage is 80 m,achieve the safety,quality,rapid,efficient construction.

关 键 词:竖井 机械化配套 装备技术 科学管理 

分 类 号:TD63[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象