作 者:姬中奎
机构地区:[1]中煤科工集团西安研究院有限公司,西安710054 [2]陕西省煤矿水害防治技术重点实验室,西安710077
出 处:《煤炭技术》2014年第4期254-257,共4页Coal Technology
基 金:"十二五"国家科技支撑计划(2012BAK04B04)
摘 要:2012年5月26日申家庄煤矿2302工作面回采时在采深约830 m处发生突水,堵水中巷道截流段承受水压高达8.2 MPa。为了完成抢险任务,研究分析了堵水条件,制定了注浆方案,按设计方案进行了施工,复矿排水后截流段安全可靠,堵水效果良好。申家庄煤矿堵水实践表明,在高水压条件下进行注浆堵水,首先要做好巷道截流段的注浆工作,同时要进行突水点采空区注浆和突水通道注浆,在截流段、采空区、突水通道经注浆后连成一个整体的情况下,巷道截流段是安全的。Water inrush happened at 2302 work face in Shenjiazhuang Coal Mine on May 26 th,2012,while the mining depth was about 830 m and the water pressure of closure segment was 8.2 MPa.For rescue mission,the construction work was done according to the design program which was drawn up based on the studying and analyzing of the plugging condition.The closure segment was safe after restoring production,which means the goal of plugging was achieved.Conclusions can be drawn based on this experience.Following with the grouting of closure segment,the water inruch point in goaf and the channel should be grouted.When the closure segment and the position and the channel of water inrush are grouted as a whole,the closure segment is safe.
分 类 号:TD743[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.225.55.253