检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]贵州高速公路集团有限公司,贵州贵阳550000 [2]中铁西北科学研究院有限公司,甘肃兰州730030
出 处:《铁道建筑》2014年第5期69-71,共3页Railway Engineering
摘 要:为保证兰新线妖魔山隧道内电气化改造顺利实施,采用地质雷达检测、现场调查等方法对隧道结构运营状态进行全面检测和评估。检测结果表明,该隧道不存在影响电气化挂网的衬砌内部及其背后空洞,但存在衬砌裂损、局部混凝土剥离、渗漏水等病害。分析病害产生的原因,采取堵排结合的方法,对隧道衬砌裂损和渗漏水进行综合整治,可为类似工程提供参考。In order to ensure the electrification reform implementation of Yaomoshan tunnel in Lanxin line,this paper conducted a comprehensive inspection and evaluation of tunnel structure operation state by adopting such methods as geological radar detection,field investigation,etc. Test results showed that there are no cavities which may affect electrified netting inside and behind the lining,but the diseases including lining cracking,local concrete peeling,water leakage are found in this tunnel. This paper analyzed the causes of diseases,applied the sealing and drainage approach and made a comprehensive treatment of tunnel lining crack and water leakage,which could provide a reference for the similar projects.
分 类 号:U457.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3