检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王瑞锋[1] 李君[1] 杨元平[1] 林洁[1] 李红燕[1]
出 处:《浙江水利科技》2014年第3期3-6,共4页Zhejiang Hydrotechnics
基 金:浙江省公益技术研究社会发展项目(编号:2012C23033);浙江省创新团队建设与人才培养(编号:2012F20032)
摘 要:飞云江特大桥位于飞云江口门水域,桥墩结构及水动力条件复杂,通过建立大比尺正态物理模型进行桥墩局部冲刷试验,对设计洪水、设计潮水条件下桥墩的最大局部冲刷深度及冲刷坑形态、范围进行预测,并通过公式估算、实测分析、试验类比的方法对试验结果进行合理性分析。为工程设计及运行安全提供技术支撑。The Feiyun river large bridge located at entrance of the river,the pier structure and hydrodynamic condition is very complex.A big scale undistorted model was set up to test the local scour of pier.It forecast the maximum local scour depth,the scour hole morphology and scour hole range of piers in condition of the design flood and spring tide.Analysed the rationality of results through the method of formula calculation,measured data analysis and testing analog,and so on.It finally offered a technological support for the engineering design and the operation safety.
分 类 号:TV83[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117