黄河某支流骨干坝蓄水情况研究  被引量:1

Research on the Impoundment of the Key Dam in a Certain Tributary of the Yellow River

在线阅读下载全文

作  者:张丽[1] 赵茹[1] 郭菲[1] 王超[1] 

机构地区:[1]华北水利水电大学水利学院,郑州450011

出  处:《中国农村水利水电》2014年第5期90-93,共4页China Rural Water and Hydropower

基  金:"十二五"国家科技支撑计划课题"黄河中游河川径流锐减驱动力及人为调控效应研究"(2012BAB02B04)

摘  要:以黄河流域某支流为例,调查了该支流骨干坝的蓄水情况,实地查勘了部分骨干坝,利用Google Earth软件查询了全部蓄水骨干坝。研究表明:支流骨干坝蓄水情况可根据调研、Google Earth查询结果结合实地查勘确定,本支流骨干坝蓄水比例为22.56%。A certain tributary of the Yellow River is taken as an example in this paper, making an investigation on the impoundment of the key darn. The sampling part of the key dams on-the-spot investigations is carried out and Google Earth software is used to search for all the impoundment key dams. The study indicates that the result of the impoundment of the key dam can be determined by combining the investigation,Google Earth and field survey and the impoundment proportion of the key dam in this tributary is 22. 56%.

关 键 词:骨干坝 蓄水情况 GOOGLE EARTH 

分 类 号:S157[农业科学—土壤学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象