检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵江[1] 刘晓平[1] 任启明[1] 周小玲[1] 扈世龙[1]
出 处:《长江科学院院报》2014年第6期32-36,共5页Journal of Changjiang River Scientific Research Institute
摘 要:为改善大源渡航电枢纽二线船闸下游通航水流条件,采用整体物理模型试验,研究了在有支流入汇的弯曲河段拟建二线船闸下游引航道口门区的通航水流条件及影响因素。基于设计方案的多次优化比选试验,提出一种在下游口门区外侧布置隔水墙的隔挡方案,该布置方案满足下游口门区船舶(队)安全航行及河段行洪能力的要求,较好地解决了该枢纽二线船闸下游通航问题,为类似工程提供科学依据和借鉴。Overall physical model test was carried out in the aim of improving the navigation flow condition in the downstream of the second ship lock of Dayuandu navigation and electricity junction. The navigation flow condition and its influencing factors in the entrance area of the approach channel of the second ship lock in winding river with tributaries were analyzed. Through many optimization tests and comparisons, a parapet project with a water-resisting wall outside the entrance area in the downstream was proposed. This optimized project meet the requirements of navigation and flood discharge capacity in the entrance area, and the problem of navigation in the shiplock' s downstream is solved. The research provides a scientific basis and reference for similar projects.
分 类 号:U641[交通运输工程—船舶及航道工程] U612.2[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.133.22