观音阁坝变形监测的难点及解决方案  

Guanyinge dam deformation monitoring difficulties and solutions

在线阅读下载全文

作  者:李延超 袁雪莲 田作佳[2] 王志忱[2] 

机构地区:[1]辽宁省观音阁水库管理局,辽宁本溪117100 [2]辽宁省水利水电科学研究院,210003

出  处:《吉林水利》2014年第5期3-5,共3页Jilin Water Resources

基  金:辽宁省科学技术农业攻关计划项目:辽宁省防汛调度管理系统研究[2011216001]

摘  要:为解决观音阁水库碾压混凝土大坝安全监测中坝顶变形监测的数据采集系统布置与水工结构冲突等问题,从多方案比较中择优确定,通过对多个基准传递等问题的综合研究,选择监测基线布置方案,形成了监测要素的工程关联,解决了变形监测的系统布置设计难点,实现了基于自动化的碾压混凝土坝全面的变形安全监测。To solve data acquisition system layout and hydraulic structures and other issues of conflict during safety monitoring of the dam crest deformation in Guanyinge Reservoir RCC from the multi-program compari-son merit determined by a number of benchmark issues such as integrated delivery research ,select a baseline monitoring program arranged to form an association to monitor the project elements to solve the difficulties of deformation monitoring system layout design ,to achieve a comprehensive safety monitoring deformation of roller compacted concrete dam based automation.

关 键 词:观音阁水库 水库信息系统 大坝安全监测 变形监测 双金属标 

分 类 号:TV642.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象