检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周俊[1] 丁剑[1] 王青[1] 宋云亭[1] 李媛媛[1]
出 处:《电力自动化设备》2014年第6期25-29,43,共6页Electric Power Automation Equipment
摘 要:结合玉树电网的实际运行情况,基于BPA软件建立了含光伏电站接入的机电暂态仿真模型,基于该模型研究了玉树电网与青海主网解列后的孤网暂态特性,指出玉树孤网的主要问题是频率稳定。采用关键断面故障仿真技术,分析了光伏电站出力和光伏接入地点对安全稳定控制策略的影响,提出了玉树孤网运行的安全稳定控制策略,建议玉树电网典型方式下不配置高频切机措施,主要由机组自身保护应对可能出现的高频问题,采用低频减负荷方案解决频率稳定问题,并通过仿真验证了控制策略的有效性。According to the actual operational conditions of Yushu Grid,an electromechanical transient simulation model with PV station is built based on BPA software,with which,the transient characteristics of Yushu Grid isolated from Qinghai main grid is researched. It is found that the frequency stability is the main problem of isolated Yushu Grid. The key section fault simulation technology is applied to analyze the impact of the output power and access location of PV station on the strategy of safety and stability control,based on which,a control strategy is proposed for isolated Yushu Grid. It is suggested that,the unit protection,instead of the high-frequency tripping scheme,should be adopted to solve the high-frequency problem under its typical operation mode and the low-frequency load shedding scheme should be adopted to solve the frequency stability problem. The effectiveness of the proposed control strategy is verified by simulation.
分 类 号:TM615[电气工程—电力系统及自动化] TM712
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.104