检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:尤雪春
出 处:《建筑施工》2014年第5期471-473,共3页Building Construction
基 金:上海建工七建集团有限公司立项课题;编号为QJKJ14-3-2
摘 要:深大基坑采用圆环支撑,一方面可以为基坑土方大开挖创造有利条件,但另一方面圆环支撑对基坑分块、对称、均衡开挖要求严格,变形控制难度大。结合天津陆家嘴广场基坑工程实际案例,着重介绍了在周边复杂环境与较高进度要求下,充分利用圆环支撑有利条件,以确保周边环境安全为前提,采取相应措施进一步提高基坑开挖效率。On one hand, the deep foundation pit with ring support can create favorable conditions for its large excavation, but on the other hand, ring support do have a strict demand on pit block, symmetry and balanced excavation, therefore, the deformation control is difficult. Taking the Tianjin Lujiazui Square Project excavation engineering as an example, the paper introduces how to make the full use of the favorable benefits of the ring support under the conditions of the complicated environment and the strict progress requirement, to improve the efficiency of excavation by proper measures under the premise of the safety of the surrounding environment.
关 键 词:双圆环支撑 复杂环境 变形控制 高效开挖 施工技术
分 类 号:TU753.1[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145