超高烟囱电动升模平台安装技术  

Installation Technology for Electric Lifting Formwork Platform in Ultra High Chimney Construction

在线阅读下载全文

作  者:彭晓月 阎文 张爱芳 

机构地区:[1]中建三局第二建设工程有限责任公司,武汉430074

出  处:《建筑施工》2014年第5期575-578,共4页Building Construction

摘  要:超高烟囱采用电动升模的工艺施工,即以筒壁为承力主体,通过附着于已具有较高强度的钢筋混凝土筒壁上的支模操作架和提升架,以及联结操作架和提升架的电动提升设备,一架固定,一架相对运动,交替爬升,从而带动模板及整个施工平台的提升。该工法可大幅提高施工效率,从而达到缩短工期的目的。满足了工程进度、质量及安全文明施工的要求,取得了良好的社会效益和经济效益。The electric lifting formwork process is used for the ultra high chimney construction. In this process, the formwork operation frame and the lifting frame are attached to a high-strength reinforced concrete cylinder wall, together with the electric lifting equipment which connects these two frames. Two frames then move up alternatively to lift the formwork and the entire construction platform. This method can significantly improve the efficiency of construction, so as to achieve the purpose of shortening the construction duration. It also meets the requirements of construction progress, quality, safety and civilized construction, and achieves good social and economic benefits.

关 键 词:烟囱 升模平台 安装 荷载试验 

分 类 号:TU755.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象