检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水利部松辽水利委员会,长春130021 [2]吉林大学环境与资源学院,长春130021
出 处:《中国水利》2014年第11期28-30,共3页China Water Resources
摘 要:在分析内蒙古扎赉特旗水文地质条件基础上,利用均衡法和面积-倍比法对节水增粮行动项目区地下水可开采量进行供需平衡分析。分析计算结果表明:项目区地下水规划水平年需水量小于地下水可开采量:规划水平年地下水开发利用程度为36.72%-82。90%,能够满足节水增粮行动项目的用水需求。Based on the hydrogeological condition of Jalaid Banner, the Water Balance Method and the Area-ratio Method are used to calculate the exploitable volume of groundwater, and then the supply and demand balance of Jalaid Banner is analyzed in the districts of Saving Water and Increasing Grain Yield. The result shows that volume of groundwater demand is less than exploitable volume during the planning year, and in the meantime the degree of utilization changes in the range between 36.72% and 82.90%, which can meet the water demand of Saving Water and Increasing Grain Yield Project.
关 键 词:东北四省区 节水增粮 地下水资源评价 均衡法 面积-倍比法 扎赉特旗
分 类 号:P641.8[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3