摘  要:清远市东城污水处理厂总规模8×104 m3/d,一期设计规模4×104 m3/d,采用CASS和转盘滤池深度处理工艺。土建采用地下式分区组团布置,各组团通过地下综合管沟相连。介绍工艺流程和主要构筑物设计情况,对主要设计特点、新技术应用及投资控制措施进行分析。The total capacity of Qingyuan DongCheng Wastewater Treatment Plant is 8 ×104 m3/d. and the first phase capacity was 4× 104 m3/d.The CASS(cyclic activated sludge system) process and rotary disc filter for deep treatment are used in the first phase project. Partition group underground layout type is applied in the project, and each group is connected through the underground integral trench. The process and main structures design are introduced, and moreover, the main design characteristics, new technology andmeasures for investment control are analyzed in this paper.

关 键 词:污水处理厂 分区组团地下式布置 综合管沟 CASS 转盘滤池 

分 类 号:X505[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象