600MW超临界汽轮机高压主汽门-调节汽门单边联合阀门活动试验综合优化措施  被引量:2

Comprehensive Optimization Measures for Unilateral Joint Valve Activity Test of High Pressure Total Valve-Governing Valve of 600MW Supercritical Steam Turbine

在线阅读下载全文

作  者:夏维 

机构地区:[1]广东珠海金湾发电有限公司,广东珠海519050

出  处:《广东电力》2014年第5期23-27,共5页Guangdong Electric Power

摘  要:通过对上海汽轮机厂600 MW超临界汽轮机高压主汽门(total valve,TV)-调节汽门(governing valve,GV)单边联合阀门活动试验的研究,提出了在试验中通过协调控制系统(coordination control system,CCS)汽轮机主控对GV进行调节的方法,解决了原有指令平衡分配方式严重依赖阀门特性的缺点,同时对取消试验的部分限制条件进行了优化。By studying on unilateral joint valve activity test of high pressure total valve-governing valve of 600 MW supercritical steam turbine in Shanghai steam turbine plant, this paper proposes a method for adjusting governing valve by steam master of coordination control system in the test which is successful in solving problem of original instruction balance distribution mode seriously relying on valve characteristics. Meanwhile, it carries out optimization on parts of constraint conditions for revocatory test.

关 键 词:汽轮机 阀门活动试验 优化措施 

分 类 号:TK323[动力工程及工程热物理—热能工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象