检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《河南机电高等专科学校学报》2014年第2期54-55,88,共3页Journal of Henan Mechanical and Electrical Engineering College
摘 要:电力负荷预测是电网调度中的一项重要工作,精确的负荷预测是电网运行安排的主要依据。文中提出了一种新型GM(2,1)模型的建模方法,克服了传统GM(2,1)模型强行定义白化微分方程常数项所带来的数据突变问题。将上述方法用于电力负荷预测,实例仿真结果表明,与传统的GM(2,1)模型相比,新模型具有更高的预测精度,为电力负荷预测提供了一种重要手段。Load forecasting is an important work in the power network dispatch. Accurate load fore casting is the basis of the power network operation arrangement. A new GM (2, 1) modeling method was presented, it overcomes the data mutation problem of traditional GM (2, 1) model that caused by defining forced albino differential equation constant term. The method was used in the power load forecasting, the simulation results show that the new model has higher precision of prediction than the traditional GM (2, 1) model, which provides an important method for the power load forecasting.
分 类 号:N945.12[自然科学总论—系统科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117