桩底后压浆技术在桥梁改扩建工程中的应用研究  被引量:2

Study on Application of Pile Bottom Post Pressure Grouting Technology in Bridge Reconstruction Extension Project

在线阅读下载全文

作  者:刘泉[1] 李茂奇[2] 

机构地区:[1]中国市政工程华北设计研究总院,天津市300074 [2]天津市市政工程研究院,天津市300074

出  处:《城市道桥与防洪》2014年第6期208-210,18,共3页Urban Roads Bridges & Flood Control

摘  要:为了减小新旧桥梁桩基基础沉降差异对桥梁造成的影响,采用桩底后压浆技术对新建桥梁钻孔灌注桩进行处理,通过对加固后的钻孔灌注桩周围的土体进行取样可知,桩底后压浆技术可以有效提高钻孔灌注桩周围土体的摩阻力,提高桩的承载力,减小新旧桥梁基础沉降差,有关经验可供相关专业人员参考。In order to decrease the influence of the pile foundation settlement difference on old and new bridges, the pile bottom post pressure grouting technology is used to treat the cast-in-situ pile of the newly built bridge. According to the sample of soil surrounding the reinforced cast-in-situ pile, it is shown that this technology can efficiently improve the frictional resistance of soil surrounding the cast-in-situ pile,improve the bearing capacity of pile and decrease the foundation settlement difference of old and new bridges. The relative experience can be referred for the similar projects.

关 键 词:桩底后压浆 桥梁改扩建 钻孔灌注桩 沉降差 

分 类 号:U445.6[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象