高压直流输电改进后的双重化保护冗余配置方案  被引量:3

Improved Redundant Configuration for HVDC Protection System

在线阅读下载全文

作  者:王春成[1] 

机构地区:[1]中国能源建设集团广东省电力设计研究院,广东广州510663

出  处:《中国电力》2014年第6期18-21,37,共5页Electric Power

摘  要:直流保护系统是特高压/高压直流输电工程的重要组织部分,直接影响到整个电网安全,因此,在特高压/高压直流输电工程中对保护系统采用冗余配置的原则。重点分析了目前主要采用的完全双重化和三取二冗余配置方案的特点,在通过改进原有完全双重化冗余配置方案的动作逻辑的基础上提出了一种改进方案。改进后的完全双重化方案能够更好地满足大型紧密联系的输变电网络中"尽可能避免拒动"的保护可靠性要求。DC protection system is the most important part in a UHVDC/HVDC project, and directly affects the gird safety. Generally, the redundant configuration principle is used in the protection system of actual UHVDC/HVDC projects. The paper discusses the reliabilities of the "two out of three" redundant configuration and the full duplication redundant configuration. Based on the original full duplication redundant configuration, an improved redundant configuration is proposed by improving the action logic. The improved redundant configuration can meet the demand of reducing the false tripping probability.

关 键 词:高压直流输电 改进后的双重化保护 冗余配置 

分 类 号:TM721[电气工程—电力系统及自动化] TM774

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象