检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团成都勘测设计研究院,成都610072
出 处:《水力发电学报》2014年第3期324-330,共7页Journal of Hydroelectric Engineering
摘 要:随着国家政策的调整和水电移民工作的不断深入,传统的水电移民安置方式已不能适应移民安置的需要,为此,各地开展了逐年货币补偿安置方式的创新研究,且部分项目实践了逐年货币补偿安置方式。结合实践情况,本文对水电移民逐年货币补偿安置方式进行了优劣分析,提出其适应性,并建议各水电项目根据自身特点选择适合的移民安置方式。With the adjustment of national policy and the incessant deepening of resettlement work, traditional method is unable to meet the need of hydropower resettlement. In recent years, new approaches of annual monetary compensation settlement have been examined and practiced in hydropower development projects. This paper summarizes our experiences, analyzes the advantages and disadvantages of these approaches, and demonstrates the adaptability and importance of selecting suitable resettlement scheme according to the characteristics of a specific hydropower project.
分 类 号:TV697.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30