检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏省防汛防旱指挥部办公室,江苏南京210029 [2]江苏省骆运水利工程管理处,江苏宿迁223800 [3]江苏省水文水资源勘测局徐州分局,江苏徐州221006 [4]江苏省水文水资源勘测局,江苏南京210029
出 处:《水文》2014年第3期48-52,共5页Journal of China Hydrology
摘 要:针对江苏省淮北地区水资源严重不足的状况,研究了淮北地区重要灌溉水源之一骆马湖所在区域的历年汛期降雨以及上游来水的规律,将骆马湖汛期划分为5个阶段,除了洪水高发期的7月11日~8月15日外,对其他四个阶段推求了频率为10%、5%、2%的入湖设计洪水,并以不同起调水位进行骆马湖调洪演算,提出了在保证洪水安全的前提下各阶段汛限水位方案,可作为汛期骆马湖水位控制调度的参考,以进一步提高洪水资源利用率.Because of serious shortage of water resources in Huaibei region of Jiangsu Province,this paper studied regular pattern of the flood season rainfall and upstream inflow of the Luomahu Lake.The lake is one of the important water source for irrigation in the region.The flood season is divided into 5 stages.Besides July 1 1th to August 15th that is the major flood period,the designed flood frequency10%,5%,2% entering the lake in other stages were analyzed and the different limit water levels were calculated.The limit water level scheme of 4 stages was suggested under ensuring safety for flood control,as reference of the lake water level control to raise the availability of floodwater resources.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.79