检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋泽甫[1] 钟以林[1] 皮显松[1] 王晶明[1] 马冲[1]
机构地区:[1]贵州电网公司电网规划研究中心,贵阳550002
出 处:《南方电网技术》2014年第2期33-37,共5页Southern Power System Technology
摘 要:针对电力系统规划中电源建设周期的不确定性对规划电网供需形势的影响,提出规划电网供需风险概率评估方法。该方法结合电源建设进度,用概率来描述电源建设周期的不确定性,建立规划电网供需风险评估及风险指标分解模型,并根据各电厂风险指标辨识电源建设的薄弱环节。以国内某省级电网为例,进行了算例分析,验证了该方法的有效性。Aiming at the influence of power supply construction period uncertainty to the supply- demand risk in planning power grid,a probabilistic assessment method of the risk is proposed in this paper. Considering the construction progress of the power supply,the method describes the uncertainty in probability,and builds up models for the risk assessment and risk indicator decomposition. And according to the risk indicator of each planning power supply project,the method does the weakness identification of power supply construction. A provincial power grid is taken as an analysis example with the proposed method,and the feasibility of the method is verified.
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112