检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国科学院寒区旱区环境与工程研究所,甘肃兰州730000 [2]水利部黄河水利委员会黄河上游水文水资源局,甘肃兰州730000
出 处:《冰川冻土》2001年第1期67-73,共7页Journal of Glaciology and Geocryology
基 金:国家自然科学基金重点项目!(497310 30 );中国科学院寒区旱区环境与工程研究所知识创新工程项目!(CACX2 10 0 16 )资助
摘 要:南水北调西线雅砻江调水工程 (简称西线调水 )是从长江的一级支流雅砻江上游地区引水至黄河源头地区的跨流域调水工程 ,是补充黄河水资源不足与解决我国西北和华北部分地区干旱缺水的重大战略措施 .由于引水枢纽坝址缺乏实测水文资料 ,我们依据附近甘孜水文站实测资料 ,采用一些非确定性的数理统计模型来计算温波引水坝址的设计年径流量 ,并对计算成果进行了合理性分析 .结果表明 ,上述计算成果基本反映了温波引水坝址径流变化的客观情况 。It is well known that there are abundant water resources in the basin of the YangtzeRiver, the first largest river in China, which is mainly located in Southern China. However, water resources are very scarce in the basin of the Yellow River, which is mainly located in Northern China. There is a western route project of south-north water diversion aiming conveyance to convey water from the Yangtze River to the Yellow River. The Wenbo damsite in the upper reach of Yalongjiang River located in Sichuan Province is a major hinge under consideration. Runoff flowing through the damsite has observed since 1991. It is necessary to calculate the annual average runoff and monthly average runoff from 1956 to 1991 at the damsite by means of some non-deterministic mathematical statistical models. Calculation is on the basis of the observation at the Ganze Hydrometric Station below the Wenbo damsite, where runoff of the Yalongjiang River has been measured since 1956. Lastly, rationality of the calculation is discussed.
关 键 词:南水北调西线工程 引水枢纽 数理统计 年径流量 计算模式
分 类 号:TV68[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222