滇池流域初期雨水的截流量确定方法研究  被引量:6

Determination of Interception Capacity of Initial Rainwater in Dianchi Lake Basin

在线阅读下载全文

作  者:张勤[1] 刘阳[1] 

机构地区:[1]重庆大学城市建设与环境工程学院,重庆400045

出  处:《中国给水排水》2014年第13期115-118,共4页China Water & Wastewater

基  金:国家水体污染控制与治理科技重大专项(2012ZX07102-001-003)

摘  要:通过对"90%降雨事件法"进行改进,优化降雨频率计算表,得出适合滇池流域的"降雨事件法",用于确定不同污染控制目标下的初期雨水截流量。并以滇池流域为例,通过计算发现,要实现滇池流域全年初期雨水截流量达到50%总降雨量的目标,累积频率P取65.67%,初期雨水截流厚度为9.7 mm。该方法亦能推广应用到全国其他地区。Through improving "90% rainfall event method" and optimizing calculation sheet of rainfall frequency, an appropriate "rainfall event method" could be achieved to calculate interception ca- pacity of initial rainwater for different targets of pollution control in Dianchi Lake Basin. Setting Dianchi Lake Basin as an example and through calculating, to achieve the goal of 50% interception capacity of in- itial rainwater in Dianehi Lake Basin, the cumulative frequency P should be set as 65.67%, and the cor- responding interception capacity of initial rainwater should be set as 9.7 mm. This method can be applied in other places in China.

关 键 词:滇池流域 初期雨水 截流量 降雨事件法 

分 类 号:TU992[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象