试油完井生产综合管理系统的开发与应用  

Application of Integrated Management System for Production of Oil Well Completion and Its Development

在线阅读下载全文

作  者:张雪松[1] 陶世军[1] 黄世财[1] 申彪[1] 刘浩[1] 彭永洪[1] 

机构地区:[1]塔里木油田公司塔北勘探开发项目经理部,新疆库尔勒841000

出  处:《油气井测试》2014年第3期29-30,76,共2页Well Testing

摘  要:以塔里木油田塔北勘探开发项目经理部试油完井生产为基础,结合油田信息化成果运用及系统集成,实现生产管理的信息化,推动了试油管理水平提升,对试油完井综合业务的优化提供了决策支持。The integrated management system for production of oi well completion is based on operation in northern Tarim oilfield exploration and development project,combined with the oilfield information results and system integration,the information of production management is realized to promote management level of the north Tarim oil exploration and development project,provide decision support for optimization of integrated service of oil well completion. By analysis of its design concept and the application process,the system development is discussed.

关 键 词:试油完井 综合管理 设计 应用 

分 类 号:TE355[石油与天然气工程—油气田开发工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象