北京地铁9号线综合监控系统南北段贯通调试方案  被引量:1

Debugging Solution for Integrating the Supervision and Control Systems of North and South Sections of Beijing Metro Line 9

在线阅读下载全文

作  者:尹晓宏[1,2] 陈志新[2] 李永红 王佳[2] 

机构地区:[1]北京城建设计发展集团股份有限公司,北京100037 [2]北京建筑大学电气与信息工程学院,北京100044

出  处:《都市快轨交通》2014年第3期108-111,119,共5页Urban Rapid Rail Transit

摘  要:结合北京地铁9号线综合监控系统南北段分期开通的实际情况,论述贯通调试的实施准备、贯通方案、调试过程和最终的数据验证。在各方人员和组织的配合下,按照中心、车站的不同实施需求,按不同的系统专业,分步骤地合理实施调试方案,为以后类似工程设计提供参考。According to the actual situation of Beijing Metro Line 9' s Integrated Supervision and Control System for south and north sections which have been opened by stages, the implementation preparations of debugging, solution, debugging process and final data validation of north-south through section are discussed. Considering the implementation differences between the centers and stations, reasonable methods of syst-em implementation are taken with the cooperation of all staff and organizations. The results of this study will provide a guidance for future similar projects.

关 键 词:轨道交通 综合监控系统(ISCS) 分段开通 贯通运营 调试 

分 类 号:U231.8[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象