基于AOE-网的建筑工程施工工期求解的算法设计与实现  被引量:1

AOE- network- based building construction period design and implementation of algorithms for solving

在线阅读下载全文

作  者:王梅[1] 

机构地区:[1]湖南信息职业技术学院,湖南长沙410200

出  处:《贵州师范学院学报》2014年第6期19-22,共4页Journal of Guizhou Education University

摘  要:要对建筑工程时间上有一个有效管理,必须采用科学的计算方法,对施工工期进行精确求解。AOE-网是一个带有权的有向无环图,图上的顶点可由建筑工程每个施工工程项目表示,每个项目间实施时间要求作为图上的权值,它是计算工期的一种最有效的图形工具。采用类C++语言设计该图形工具的算法,为用计算机来求解工期提供了一种有效的方法。To have a construction time of effective management must adopt a scientific method of calculating ac- curate solution for the construction period. AOE - network is one with the right of a directed acyclie graph, graph vertices by construction each construction project that requires each project implementation time between weights as a graph. It is to calculate the duration of one of the most effective graphical tool. Class C + + language using the graphical tools designed algorithm for the use of computers to solve period provides a most effective and useful way.

关 键 词:AOE-网 施工工期 有向无环图 活动持续时间 

分 类 号:TP11[自动化与计算机技术—控制理论与控制工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象