检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河南省地质矿产勘查开发局第二地质勘查院,许昌461000
出 处:《价值工程》2014年第22期308-310,共3页Value Engineering
基 金:内蒙古自治区地质勘查基金;编号09-1-KC045
摘 要:曹四夭钼矿是河南省地勘二院2010年新发现的一个特大型钼矿。通过详查工作发现,山前断裂F1断层的下盘迎水一侧基岩裂隙含水层富水性中等-强,是矿坑的主要充水含水层。矿床主要直接充水因素为矿体基岩裂隙水和大气降水。将来矿山开采应注意基岩裂隙水和临时性暴雨形成的洪水对矿坑的危害。矿区水文地质条件的研究对未来矿山设计、开发及相邻矿区水文地质工作具有指导和借鉴意义。Caosiyao molybdenum deposit is a new super large molybdenum deposit which was discovered by No. 2 Geo-exploration Institute Henan Provincial Bureau of Geo-exploration and Mineral Development in 2010. After detailed investigation, it has heen found thatthe piedmont fault F1 footwall side which connects to the underground water the water content of the bedrock fissure aquifer is mediumhigh, which is the main water aquifer of the pit. The main direct water filling factors of the deposit are bedrock fissure water of the ore body and atmospheric precipitation. We should pay attention to the floods that caused by the bedrock fissure water and temporary rainstorms in the future mining. Geological conditions of mine hydrology has guidance and reference role fur the future work of mine hydrogeological, mine design, development and adjacent.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15