检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘鸿鸣
机构地区:[1]上海市基础工程集团有限公司,上海200002
出 处:《建筑施工》2014年第6期729-730,共2页Building Construction
摘 要:随着曲线顶管在地下管线工程中使用日益频繁,针对轴线控制的研究也越来越多,但多集中于工具管处。结合上海市污水治理白龙港片区南线东段工程中的超长距离曲线混凝土顶管施工,重点对后续跟进管节对土体的影响以及控制技术进行了阐述,为以后更为复杂的顶管积累了经验。With the frequent use of curved pipe-jacking in the underground pipeline project, more researches on axis control appear, but many of them focus on the tools tube. Combined with a super long-distance curved concrete pipe-jacking construction in the wastewater treatment project in the south east part of Shanghai Bailong port area, the paper mainly introduced the influence of the follow-up tubes on the surrounding soil mass and the corresponding control technology so as to accumulate experience for more complicated pipe-jacking project in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145