降低阿海水电站碾压混凝土坝体最高温度的课题研究  被引量:1

Study on Topic of Lowering the Maximum Temperature on Ahai Hydropower Station Rolling Concrete Dam

在线阅读下载全文

作  者:付琛 张红权 简秋霞 

机构地区:[1]长江勘测规划设计研究有限责任公司,武汉430010

出  处:《水利建设与管理》2014年第6期72-75,84,共5页Water Conservancy Construction and Management

摘  要:为保证阿海水电站碾压混凝土工程施工质量,减少温度裂缝的发生,通过QC小组现场活动,进行现状调查、目标确定、原因分析,确认要因后制定对策,进而展开对策实施。QC小组活动效果证明:大坝混凝土早期最高温度得到了降低,进而也降低了产生温度裂缝的风险,实现了课题目标,保证了工程工期,并带来了显著的社会效益与经济效益。A series of on-site activities of QC team are carried out in order to ensure construction quality of Ahai Hydropower Station Rolling Concrete Dam and reduce incidence of temperature cracks. Objective is determined and causes are analyzed through situation investigation, causes are confirmed, countermeasures are formulated, thereby developing strategy implementation. Activities of QC team verifies that early maximum temperature of dam concrete is lowered, thereby lowering the risk of temperature risks, achieving topic objective, ensuring project period, and bringing significant social benefits and economic benefits.

关 键 词:碾压混凝土 最高温度 温度裂缝 温控改善措施 

分 类 号:TV738[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象