唱凯堤决口封堵抢险方案及关键技术措施  被引量:11

Emergency Rescue Scheme and Key Technology Measures of Changkai Dike Crevasse Sealing

在线阅读下载全文

作  者:张利荣[1] 严匡柠[1] 张海英[1] 

机构地区:[1]武警水电第二总队,江西南昌330096

出  处:《施工技术》2014年第12期26-28,83,共4页Construction Technology

基  金:武科研-抢险2011-01

摘  要:2010年6月21日,江西抚州唱凯堤由于洪水发生宽度为348m的特大决口。武警水电部队奉命承担决口封堵任务,在抢险中充分发挥了专业部队的优势,制定了机械化双向立堵的抢险方案,采用抢通抢修道路、控制决口宽度、削减洪峰流量、创造双向立堵条件、多方制备封堵料源等关键技术措施,实现了快速封堵的目标。总结出有效可行的技术措施,为类似险情处置提供有益的借鉴参考。The Fuzhou Changkai dike at Jiangxi take place crevasse by flood at June 21st,2010. The soldiers of Hydropower Force of Armed Police undertake the sealing task, then using the soldier advantages to formulate the sealing scheme of sealing from two directions. A series of key technique measures are used including rush repair the roads,control the dike width,reducing the peak discharge, creating sealing conditions,materials making and preparation to realize the rush sealing aim. The feasible technology measures are summarized. It gives a reference for other emergency rescue.

关 键 词:抢险 决口封堵 戗堤 施工 措施 

分 类 号:TV871[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象