旁多水电站机组定子下线技术  被引量:1

Stator Winding Installation Technology of Pangduo Hydroelectric Station

在线阅读下载全文

作  者:焦玉庚 熊增生[1] 钟海华[1] 

机构地区:[1]武警水电第二总队第六支队,福建厦门361021

出  处:《施工技术》2014年第12期97-100,共4页Construction Technology

摘  要:旁多水电站为西藏目前最大的水电工程项目,其发电机定子分4瓣运至现场,在完成定子机座组装及铁心叠片之后,进行定子下线工作,包括端箍安装、定子线棒嵌装、槽楔装配、绑扎、焊接、绝缘盒灌装、汇流铜环安装与焊接、定子喷漆及整体耐压等,着重对定子下线技术进行了介绍。Pangduo Hydroelectric Station is the biggest hydroelectric project in Tibet at present. Generator stator is splited to four steps and shipped to the site,then the stator winding installation is done,including the ends of the hoop installation, stator bars fitting, wedge assembly, banding, welding, insulation boxes filling, convergence copper ring installation and welding, painting the stator and the electrical test. The stator winding installation technology is emphatically introduced.

关 键 词:水电站 发电机 定子 下线 焊接 

分 类 号:TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象