大型综放液压支架快速搬运技术研究  被引量:5

Research on Rapid Carrying Technology of Larger Synthetical Support

在线阅读下载全文

作  者:张颖超[1] 许建玉 

机构地区:[1]青岛滨海学院,山东青岛266590 [2]国网菏泽供电公司,山东菏泽274000

出  处:《煤矿机械》2014年第6期196-197,共2页Coal Mine Machinery

摘  要:为了提高煤矿井下综放液压支架搬运效率,在对煤矿井下支架搬运情况分析的基础上,结合工程(IE)技术,应用其搬运技术,通过对支架组装流程和搬运流程分析,提出了大型综采液压支架的快速搬运方法。该方法有效保证支架搬运的高效性与安全性,缩短工作面安装工期,降低成本,提高生产效益。To enhance the efficiency of carrying fully-mechanized sublevel synthetical support, a new technology model was put forward. Basis on the analysis of the condition of carrying synthetical support and Industrial Engineering, through the analysis of the assembly process and carrying process, we proposed the rapid carrying technology of larger synthetical support. This method can effectively guarantee high efficiency and safety, shorten the time of installation time, reduce costs and improve production efficiency.

关 键 词:综放支架 快速搬运 组装流程 搬运流程 

分 类 号:TD355[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象